Local community of Lahr - Complete closure (K2)

The "main road" is passable for residents up to the construction site. However, there is no turning possibility for larger vehicles.

A detour is signposted via Geichlingen > Körperich > Hüttingen near Lahr

Information on waste disposal on 08.07.2025:

For residents directly affected by the closure:

Until the construction work is completed, the garbage cans must be placed in a location accessible to the refuse collection vehicle for emptying until the closure is lifted. After the closure has been lifted, the garbage can must be returned to its usual location for emptying.

We ask for your attention.

South Eifel Municipal Administration

Road traffic authority

Neuerburg, 18.06.2025

Help with accessibility

  • General

    We endeavor to make our websites accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.