Applying for special use of public space for work and construction sites

  • Service description

    If there is not enough space on your construction site, you may need to temporarily use a public area. If you want to use public areas in connection with your construction site, this constitutes special use. You must apply for a permit (special use permit) from the relevant authority in advance.

    Work sites/construction measures that affect the road and road traffic must be secured by traffic signs/traffic facilities and road traffic must be regulated.

    If work sites/construction work or other uses (e.g. storage of construction materials, installation of construction equipment) require the use of roads, paths and squares, these areas must be secured by traffic signs and traffic facilities. It does not matter whether it is work sites/construction work on the road itself or work next to or above the road.

  • Procedure

    • You submit your application with the necessary documents to the responsible office.
    • The responsible office will check your application and request any missing documents or information from you.
    • The responsible office will inform you of the decision in writing.
  • Prerequisites

    • They do not restrict the safety of traffic.
    • They do not disproportionately impair the ease of traffic flow.
    • They do not disproportionately impair public use.
    • They do not disproportionately impair path components.
    • They do not disproportionately restrict environmental concerns.
    • They do not disproportionately restrict urban development interests.
    • They do not disproportionately restrict public interests, including the generation of revenue from the use of the path.
    • They do not disproportionately restrict the public or private rights of third parties.

    The person responsible for traffic safety must have the necessary expertise. This is acquired through training in accordance with the information sheet on the general conditions for the specialist knowledge required for traffic safety at road works (MVAS training). It can also be acquired as part of training as a road builder.

  • What documents are required?

    • Informal application for a special use permit
    • Documents describing the nature and scope of the special use (e.g. a sketch showing the dimensions)
    • You may have to submit further documents. You will be informed accordingly by the responsible office during the procedure.

    Before starting work that affects road traffic, those responsible must obtain instructions from the competent authority on how their work sites are to be cordoned off and marked, whether and how traffic is to be restricted, directed and regulated and, if necessary, how traffic lights are to be operated. According to § 45 Para. 6 StVO, construction companies must submit a traffic sign plan, other companies do not.

    When submitting the application, please state, among other things:

    • Complete address details of the applicant including telephone number/email for queries
    • Nature of the specific project
    • Precise location details/description of the location/preparation of a sketch if necessary
    • Duration/period of the measure (if applicable with time)
    • Person responsible for traffic safety with full name and telephone number so that they can be contacted at any time
  • What fees apply?

    A fee is charged for the granting of the permit. Fees may also be charged for the use of the area. The amount of the fees depends on the type, scope and location of the special use.

    The scale of fees for road traffic measures provides for a fee range of between EUR 10.20 and EUR 767 (depending on the duration and scope of the work, classification of the road, any site visits, etc.). Special usage fees may also be charged in accordance with municipal special usage fee regulations.

  • What deadlines do I have to observe?

    None. You must have the permit before you start the special use.

    The applicant (construction company, private individual) must apply for the traffic order in writing at least two weeks before the start of work (no binding form).

  • Processing time

    The processing time depends on the type and scope of your application and the quality of the documents submitted.

  • Legal basis

  • Legal remedy

    • Contradiction
    • Action before the administrative court
  • Applications / Forms

    A written application is required.
    Some road traffic authorities have corresponding application forms available or can be downloaded from the website.

  • What else should I know?

    The following information is available:

    Even if all factual and legal requirements are met, you are not entitled to be granted a special use permit. The competent authority will decide on your application at its own discretion.

    As a rule, the competent authority will grant you the special use permit for a limited period and subject to revocation. This means that the permit issued can be withdrawn. The permit is usually issued with conditions that you must fulfill.

    The competent authority may require you to pay for the removal of damage caused by your special use. The competent authority may also require you to make an advance payment or deposit a sum of money as security.

    Official traffic signs and equipment may only be erected if they have been ordered in advance by the competent authority.

    The applicant/contractor must implement the traffic safety measures ordered by the road traffic authority on his own responsibility.

    Private individuals can also use the services of a specialist company or borrow traffic signs and equipment from them. Barrier material can also be borrowed from the municipal building yards in individual cases (possibly for a fee); the road traffic authorities can also provide information on this in individual cases.

  • Remarks

    It is always advisable to contact the responsible authority in advance by telephone for precise coordination and clarification of the details.

  • Author

    Forwarding service: Deep link to the original portal

Who should I contact?

The administrations of the non-association municipalities, the association municipal administrations, the municipal administrations in independent and large district towns are responsible for issuing traffic regulations/issuing permits as road traffic authorities; in the case of non-local workplaces, the district administrations are responsible.

In order to carry out road construction work and to prevent extraordinary damage to the road, the road construction authorities can also order traffic bans and restrictions, divert traffic and direct it by means of markings and guidance systems.

Responsible departments

Responsible employees

Help with accessibility

  • General

    We endeavor to make our websites accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    ⌘command
    +

    Smaller

    ⌘command
    –

    Larger

    Ctrl
    +

    Smaller

    Ctrl
    –
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    ⌃control
    ⌥option
    ⌘command
    .

    Decrease

    ⌃control
    ⌥option
    ⌘command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly switch the high contrast mode on or off.

  • Invert colors

    Press the following key combination to switch color inversion on and off:

    ⌃control
    ⌥option
    ⌘command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the color inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colors

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    ⌥option
    ⌘command
    8

    Enlarge view

    ⌥option
    ⌘command
    =

    Reduce view

    ⌥option
    ⌘command
    –
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Reduce view

    –